Certification Record | CSA Group.
Customer | Class | File Number |
---|---|---|
Weidmueller Interface GmbH & Co. KG
Klingenbergstrasse 26
Detmold
North Rhine-Westphalia
Germany
32758
|
5318-01
POWER SUPPLIES - For Hazardous Locations
|
200039
|
Class I, Division 2, Groups A, B, C, and D, T4
Component type power supply for use in industrial control equipment
Models | Input Voltage (VAC) | Input Frequency (Hz) | Input Current (A) | Output Voltage (VDC) | Output Current (A) |
PRO INSTA 16W 24V 0.7A | 100~240 | 50‑60 | 0.25‑0.45 | 24 | 0.7 |
PRO INSTA 30W 24V 1.3A | 100~240 | 50‑60 | 0.5‑1.0 | 24 | 1.3 |
PRO INSTA 30W 12V 2.6A | 100~240 | 50‑60 | 0.5‑1.0 | 12 | 2.6 |
PRO INSTA 30W 5V 6A | 100~240 | 50‑60 | 0.5‑1.0 | 5 | 6 |
PRO INSTA 60W 24V 2.5A | 100~240 | 50‑60 | 0.7‑1.5 | 24 | 2.5 |
PRO INSTA 60W 12V 5A | 100~240 | 50‑60 | 0.7‑1.5 | 12 | 5 |
PRO INSTA 90W 24V 3.8A | 100~240 | 50‑60 | 1.2‑2.4 | 24 | 3.8 |
PRO INSTA 96W 24V 4A | 100~240 | 50‑60 | 1.2‑2.5 | 24 | 4 |
PRO INSTA 96W 48V 2A | 100~240 | 50‑60 | 1.2‑2.5 | 48 | 2 |
Conditions of Acceptability:
1. The above models are certified only as components of other certified equipment, where the suitability of the combination of the final equipment must be determined by CSA.
2. The above model has been found suitable for operation at an ambient of -25 to 70C (>55C, Derating: 2.5%/K);
3. The above models are comply with Class 2 output, excepted models PRO INSTA 96W 24V 4A, and PRO INSTA 96W 48V 2A.
4. The above model is intended for use in a controlled environment (Pollution Degree 2).
5. The above models should be mounted in a vertical location.
6. Installation in accordance with the CEC Part I or NEC as applicable.
7. The above models must be used in a suitable degree of protection enclosure to meet requirements in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
Class I, Division 2, Groups A, B, C, D T4
DC buffer module
Models |
PRO DC BUFFER 24V 20A |
Input | Output | Buffer Output | Buffer Time | Temperature | ||
VDC | A | VDC | A | |||
24V | 26A | 24V | 20A | 22V/Vin-1V, 20A; Power boost 25A (≤45°C) | 20A, 0.2S | -25°C…+70°C (?+60°C Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations and the enclosure can only be opened by use of a tool, where final assembly is subject to acceptance by the local authority having jurisdiction.
- The ambient temperature of -20°C to +70°C applies to the enclosure internal air surrounding the equipment.
- The final enclosure must bear the following warning: “DO NOT CONNECT OR DISCONNECT WHEN ENERGIZED UNLESS AREA IS KNOWN TO BE NON-HAZARDOUS” and “DO NOT OPEN WHEN AN EXPLOSIVE ATMOSPHERE IS PRESENT”
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO DC BUFFER 24V 40A |
Input | Output | Buffer Output | Buffer Time | Temperature | ||
VDC | A | VDC | A | |||
24V | 46A | 24V | 40A | 22V/Vin-1V, 40A; Power boost 45A (≤45°C) | 40A, 0.2S | -25°C…+70°C (?+60°C Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations and the enclosure can only be opened by use of a tool, where final assembly is subject to acceptance by the local authority having jurisdiction.
- The ambient temperature of -20°C to +70°C applies to the enclosure internal air surrounding the equipment.
- The final enclosure must bear the following warning: “DO NOT CONNECT OR DISCONNECT WHEN ENERGIZED UNLESS AREA IS KNOWN TO BE NON-HAZARDOUS” and “DO NOT OPEN WHEN AN EXPLOSIVE ATMOSPHERE IS PRESENT”
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Power supply
Models |
PRO TOPDC 24V/24V 5A |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 5.7 | 24 | 5 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOPDC 24V/24V 5A EX |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 5.7 | 24 | 5 | -40°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOPDC 24V/24V 10A |
PRO TOPDC 24V/24V 10A U+ |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 11 | 24 | 10 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOPDC 24V/24V 10A EX |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 11 | 24 | 10 | -40°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOPDC 24V/24V 20A |
PRO TOPDC 24V/24V 20A U+ |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 22 | 24 | 20 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOPDC 24V/24V 20A EX |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 22 | 24 | 20 | -40°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOPDC 24V/48V 10A |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
24 VDC | - | 22 | 48 | 10 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K) |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOP2 120W 24V 5A UW |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
100~240 VAC | 50-60 | 2.0-1.0 | 24 | 5 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K)
|
Y 230/400~500VAC 2W+PE | 50-60 | 0.7-0.5 |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOP2 120W 24V 5A UW EX |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
100~240 VAC | 50-60 | 2.0-1.0 | 24 | 5 | -40°C…+60°C, +60°C…+70 (Derating:2.5%/K)
|
Y 230/400~500VAC 2W+PE | 50-60 | 0.7-0.5 |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOP2 240W 24V 10A UW |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
100~240 VAC | 50-60 | 3-1.3 | 24 | 10 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K)
|
Y 230/400~500VAC 2W+PE | 50-60 | 1.4-0.8 |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOP2 240W 24V 10A UW EX |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
100~240 VAC | 50-60 | 3-1.3 | 24 | 10 | -40°C…+60°C, +60°C…+70 (Derating:2.5%/K)
|
Y 230/400~500VAC 2W+PE | 50-60 | 1.4-0.8 |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Class I, Division 2, Groups A, B, C, D T4
Models |
PRO TOP2 240W 48V 5A UW |
Input | Output | Temperature | |||
V | Hz | A | VDC | A | |
100~240 VAC | 50-60 | 3-1.3 | 48 | 5 | -25°C…+60°C, +60°C…+70 (Derating:2.5%/K)
|
Y 230/400~500VAC 2W+PE | 50-60 | 1.4-0.8 |
Conditions of Acceptability:
- The equipment shall be installed in a suitable degree of protection enclosure to meet requirement in Class I, Division 2 locations, where final assembly is subject to acceptance by the local authority having jurisdiction.
- When in use, do not adjust the switch and Potentiometer unless the area is known to be non-hazardous.
- Installation shall be in accordance with the CEC Part I or NEC as applicable.
Contact an
Expert

We’re always here to help. Let’s talk.
We’re here to answer your questions and help you get started right away. Call or send us a message anytime.