Indonesia

Indonesia (SDPPI)- Covid-19 Update
SDPPI is not accepting applications for applications that include local testing since March 16, indefinitely. Applications using foreign recognized lab test reports will continue to be accepted. For Routers, Switches, Video Conferencing and DWDM (Dense Wavelength Division Multiplexing) products, SDPPI is accepting accredited EMC and Safety reports. Local functional testing may be delayed by up to 6 months after the type approval is issued. If a local functional test report is not provided to SDPPI within 6 months from the delivery of the type approval certificate, the approval will be canceled.