Codes & Standards - Purchase
IWA 33-3:2021
Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
SKU: iso_082192_178239
Published by ISO
Publication Year 2021
1 Edition
80 pages
Product Details
This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.
Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.
Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.