ISO 16484-1:2024
Building automation and control systems (BACS) — Part 1: Project specification and implementation
Product Details
This document specifies the phases required for the BACS project, including
— design (determination of project requirements and production of design documents including technical specifications),
— engineering (detailed function and hardware design),
— installation (installing and commissioning of the BACS), and
— completion (handover, acceptance and project finalization).
This document also specifies the requirements for as-built documentation and training.
This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.