IEC 61784-5-3:2018+AMD1:2024 CSV
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3
Product Details
This edition includes the following significant technical changes with respect to the previous edition:
a) an addition of 4-pair cabling (see C.4.4.1.2.1and C.5.3.2);
b) an addition of the connector M12 X-Coding (see C.4.4.2.2);
c) an addition of the definition of End-to-end links (see C.4.4.3.1);
d) a revision of Table C.17 (see C.5.2.1);
e) a formula for the NEXT limits of End-to-end links (see C.6.3.2.1.2).