IEC 60964:2018
Nuclear power plants - Control rooms - Design
Product Details
a) to review the usage of the term “task” ensuring consistency between IEC 60964 and IEC 61839;
b) to clarify the role, functional capability, robustness and integrity of supporting services for the MCR to promote its continued use at the time of a severe accident or extreme external hazard;
c) to review the relevance of the standard to the IAEA safety guides and IEC SC 45A standards that have been published since IEC 60964:2009 was developed;
d) to clarify the role and meaning of “task analysis”,
e) to further delineate the relationships with derivative standards (i.e. IEC 61227, IEC 61771, IEC 61772, IEC 61839, IEC 62241 and others of relevance to the control room design);
f) to consider its alignment with the Human Factors Engineering principles, specifically with the ones of IAEA safety guide on Human Factors (DS-492) to be issued.